880 St Nicholas Avenue,Manhattan, NY 10032

36 Units

Built in 1920

6 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
56 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 88 violations which is 2.44 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
20Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
34Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
34Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 16, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department window opening at east wall in the 1st room from east at north located at apt 44, 4th story, 2nd apartment from north at eastNov sent out
Apr 12, 2024§ 27-2005 adm code properly repair with similar material the broken or defective vinyl tiles in the private hallway located at apt 44, 4th story, 2nd apartment from north at eastNov sent out
Apr 12, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 2sq ft at east wall in the kitchen located at apt 44, 4th story, 2nd apartment from north at eastNotice of issuance sent to tenant
Mar 22, 2024§ 27-2005 adm code properly repair with similar material the broken or defective vinyl tiles at floor in the private hallway located at apt 44, 4th story, 1st apartment from north at eastCiv14 mailed
Mar 19, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the 1st room from east at south, the bathroom located at apt 44, 4th story, 2nd apartment from north at eastCiv14 mailed
Feb 27, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall in the 1st room from east at north located at apt 44, 4th story, 2nd apartment from north at eastCiv14 mailed
Feb 27, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east located at apt 44, 4th story, 2nd apartment from north at eastCiv14 mailed
Feb 14, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east at north located at apt 44, 4th story, 2nd apartment from north at eastCiv14 mailed
Feb 14, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from north at east wall in the kitchen located at apt 44, 4th story, 2nd apartment from north at eastCiv14 mailed
Feb 14, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st door from east at south wall, 4th door frame from east at south wall in the private hallway located at apt 44, 4th story, 2nd apartment from north at eastCiv14 mailed
Feb 14, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the 1st room from east at north located at apt 44, 4th story, 2nd apartment from north at eastCiv14 mailed
Feb 14, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall, 1st door frame from south at west wall, 1st radiator from north at east wall in the 1st room from east at south located at apt 44, 4th story, 2nd apartment from north at eastCiv14 mailed
Feb 14, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from east at south located at apt 44, 4th story, 2nd apartment from north at eastCiv14 mailed
Feb 14, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the baseboard at south wall in the 5th room from east located at apt 44, 4th story, 2nd apartment from north at eastNov sent out
Feb 14, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the west wall, ceiling in the 6th room from east located at apt 44, 4th story, 2nd apartment from north at eastNov sent out
Feb 14, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from west at north wall, 1st riser from east at south wall in the bathroom located at apt 44, 4th storyCiv14 mailed
Feb 14, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall in the kitchen located at apt 44, 4th story, 2nd apartment from north at eastCiv14 mailed
Feb 14, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east, the 1st room from east at north located at apt 44, 4th storyCiv14 mailed
Feb 13, 2024§ 27-2005 hmc: properly repair or replace the broken or defective upper escutcheon plate at south 1 riser in the 6th room from east located at apt 44, 4th story, 2nd apartment from north at eastCiv14 mailed
Jan 31, 2024§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles around steam pipe in the 1st room from east at north located at apt 44, 4th story, 2nd apartment from north at eastCiv14 mailed

Property Owners and Associates

880 St Nicholas, LLC
Owner, Corporate Owner
4(1)

2 Properties

90 Units

Alan Shamah
Head Officer
3(38)

33 Properties

1170 Units

Carl Zekaria
Site Manager, Officer
3.1(34)

30 Properties

1085 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet