2371 Belmont Avenue,Bronx, NY 10458

27 Units

Built in 1907

5 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
129 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 90 violations which is 3.33 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
15Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
32Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
43Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 17, 2024§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 24, 5th story, 1st apartment from east at southNov sent out
Apr 17, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and north wall at public hallway 4th storyNov sent out
Mar 18, 2024§ 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box signage missing at public hall, 1st storyNov sent out
Mar 18, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and north wall at public hall, 5th storyNov sent out
Mar 18, 2024§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder and securing by using nuts and bolts, at east exterior wall stack at fire escapeNov sent out
Feb 25, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at vestibule at public hall, 1st storyNov certified on time
Feb 15, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 4, 2nd story, 1st apartment from north at eastNov sent out
Feb 08, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 8 sqft at west wall in the bathroom located at apt 14, 3rd story, 1st apartment from south at westNotice of issuance sent to tenant
Feb 08, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling bulkhead 5th story roof located at aptNov certified on time
Feb 08, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at north wall 1st story public hallway located at aptNov certified on time
Feb 07, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall, 1st window frame from west at north wall in the bathroom located at apt 4, 2nd story, 1st apartment from north at eastNov sent out
Feb 07, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall in the 1st room from north located at apt 4, 2nd story, 1st apartment from north at eastNov sent out
Feb 07, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st door from east at south wall, 1st door frame from east at south wall, 1st window frame from south at west wall in the 2nd room from north located at apt 4, 2nd story, 1st apartment from north at eastNov sent out
Jan 10, 2024§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from north located at apt 4, 2nd story, 1st apartment from north at eastNov sent out
May 14, 2021§ 27-2005 adm code paint metal in accordance with dept. regulation at riser pipe in the 3rd room from east located at apt 13a, 3rd story, 2nd apartment from east at southNot complied with

Property Owners and Associates

Belmont East 186 Realty LLC
Corporate Owner
2.2(3)

2 Properties

43 Units

David Diaz
Site Manager
2.5(1)

1 Property

27 Units

Kinyan Holding Corp.
Corporate Owner
2.1(6)

6 Properties

164 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

It’s ehh, I’ll give it 1 out of 5 stars
Former Tenant
Pros:
They separate recycling and trash (c) openigloo...
Cons:
The landlord doesn’t care about (c) openigloo a...
Advice to owner:
Do better, care about your tenants, that’s why ...