2025 Seward Avenue,Bronx, NY 10473

179 Units

Built in 1978

8 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
438 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 353 violations which is 1.97 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
40Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
239Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
74Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 22, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and north wall at public hallNov sent out
Mar 21, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak above ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from south at west , section ''north''Nov sent out
Mar 21, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from south at west , section ''north''Nov sent out
Mar 21, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... 1 sq.ft. at east wall in the kitchen located at apt 3e, 3rd story, 1st apartment from north at east , section ''north''Notice of issuance sent to tenant
Mar 21, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak above ceiling in the kitchen located at apt 3e, 3rd story, 1st apartment from north at east , section ''north''Nov sent out
Mar 21, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3e, 3rd story, 1st apartment from north at east , section ''north''Nov sent out
Mar 12, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and north wall building entrance at public hallNov sent out
Mar 08, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 4 sq ft at ceiling approx 4 sq ft at north wall east 2 bathroom in the bathroom located at apt 3k, 3rd story, 2nd apartment from east at south , section ''north''Notice of issuance sent to tenant
Mar 08, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 4 sq ft at ceiling approx 4 sq ft at north wall east 2 bathroom in the bathroom located at apt 3k, 3rd story, 2nd apartment from east at south , section ''north''Notice of issuance sent to tenant
Mar 06, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department north wall at public hall, 1st storyNov sent out
Jan 29, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 4th room from north located at apt 7h, 7th story, 1st apartment from north at eastNov sent out
Jan 21, 2024§ 27-2005 hmc: properly repair or replace the broken or defective lower sash counter balance window in the kitchen located at apt 3e, 3rd story, 1st apartment from north at eastNov sent out
Jan 18, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling approx. 2 sq. ft. in the bathroom located at apt 25, 1st story, 1st apartment from south at west , section at eastNotice of issuance sent to tenant
Jan 14, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 6 sq ft at ceiling in the 1st room from north at west located at apt lb, 2nd story, 2nd apartment from south at west , section ''east''Notice of issuance sent to tenant
Nov 28, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 6s, 6th story, 3rd apartment from south at westNov sent out
Nov 28, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 6s, 6th story, 3rd apartment from south at westNov sent out
Sep 03, 2023§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 22, 1st apartment from north at east , section at westNov sent out
Aug 07, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 6s, 6th story, 3rd apartment from south at westNov sent out
Aug 07, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 2nd bathroom from north located at apt 4s, 4th story, 3rd apartment from south at westNov sent out
Aug 07, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 6s, 6th story, 3rd apartment from south at westNov sent out
Jul 19, 2023§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl , in the bathroom located at bsmt-apt 22, 1st bsmt-apt from north at eastNov sent out
Jun 30, 2023§ 27-2005 hmc: properly repair or replace the broken or defective gasket at refrigerator door in the kitchenette located at apt 3, 1st story, 4th apartment from south at westNov sent out
Jun 08, 2023Section 27-2005 adm code properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 70o, 7th story, 3rd apartment from west at northNov sent out
Apr 29, 2023Section 27-2005 adm code replace with new the missing cabinet drawer, 1st drawer from east at south in the kitchen located at apt 4o, 4th story, 3rd apartment from north at east , section ''west''Nov sent out
Apr 29, 2023Section 27-2005 hmc: properly repair or replace the broken or defective cabinet shelf , 2nd cabinet from south at west in the kitchen located at apt 4o, 4th story, 3rd apartment from north at east , section ''west''Nov sent out
Mar 19, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchen located at apt 6g, 7th story, 3rd apartment from north at eastNot complied with
Jan 14, 2023Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl water closet in the bathroom located at apt 22, 1st story, 1st apartment from north at east , section at westNov sent out
Jan 14, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and all walls in the kitchen located at apt 7c, 7th story, 3rd apartment from south at westNov sent out
Jan 14, 2023Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl water closet in the bathroom located at apt 3c, 3rd story, 1st apartment from west at northNov sent out
Aug 31, 2022Section 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the 2nd bathroom from north located at apt 4t, 4th story, 2nd apartment from south at westNov sent out
Jun 22, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 3c, 3rd story, 3rd apartment from south at westNov sent out
Jun 22, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at west wall and south wall inside closet in the private hallway located at apt 3c, 3rd story, 3rd apartment from south at westNov sent out
Jun 22, 2022Section 27-2005 adm code properly repair with similar material the broken or defective wood base board at west and south wall inside closet in the private hallway located at apt 3c, 3rd story, 3rd apartment from south at westNov sent out
May 12, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling, in the entire apartment located at apt 3n, 3rd story, 4th apartment from north at eastSecond no access to re-inspect violation
Oct 06, 2021Section 27-2005 adm code properly repair with similar material the broken or defective base cabinet at sink in the kitchen located at apt 4o, 4th story, 3rd apartment from north at east , section ''west''First no access to re- inspect violation
Jul 16, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 1h, 1st story, 4th apartment from north at east , section at westFirst no access to re- inspect violation
Dec 21, 2020Section 27-2005 adm code properly repair with similar material the broken or defective vinyl tiles at floor in the 1st room from north at east located at apt 22, 1st story, 1st apartment from north at eastFirst no access to re- inspect violation
Dec 14, 2020Section 27-2005 adm code properly repair the broken or defective mechanical vent system in the kitchen located at apt 22, 1st apartment from north at east , section at westFirst no access to re- inspect violation
Dec 06, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and all ceilings in the entire apartment located at apt 1h, 2nd story, 1st apartment from west at northFirst no access to re- inspect violation
May 24, 2019Section 27-2005 adm code properly repair the broken or defective locking device at window sashes thru-out in the entire apartment located at apt 3, 1st story, section ''east''First no access to re- inspect violation

Property Owners and Associates

Clemens Capital
Agent
2.1(2)

1 Property

179 Units

David Kornitzer
Site Manager, Officer, Head Officer
2.1(2)

1 Property

179 Units

Mendel Kaff
Corporate Owner
2.5(3)

2 Properties

223 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Nothing to sweet to say
Former Tenant
Pros:
Nothing good to say
Cons:
Floods , poor work ethic (c) openigloo , mice i...
Advice to owner:
Do better
Building is horrible dirty and unsafe homeless sleeping in hall ways
Former Tenant
Pros:
Apartment size is nice, and (c) openigloo they ...
Cons:
Tenant allow dogs to walk (c) openigloo without...
Advice to owner:
Building is in desperate need of Sercurity. And...