2925 Matthews Avenue,Bronx, NY 10467

63 Units

Built in 1928

6 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
256 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 46 violations which is 0.73 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
18Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
23Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
5Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Feb 07, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th story, section at northNov sent out
Nov 18, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 1st foyer from east at north located at apt 6f, 6th story, 2nd apartment from south at west , section at southNov sent out
Nov 18, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the west wall in the 3rd bathroom from east at north located at apt 6f, 6th story, 2nd apartment from south at west , section at southNov sent out
Nov 18, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the south wall, west wall in the 3rd room from east at south located at apt 6f, 6th story, 2nd apartment from south at west , section at southNov sent out
Oct 05, 2017Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .... at public hall, 1st storyNov sent out
Oct 05, 2017Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Oct 05, 2017Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd.Nov sent out
Oct 05, 2017Section 27-2026 adm code repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 6f, 6th story, 2nd apartment from south at westNov sent out
Oct 05, 2017Section 27-2005 adm code replace with new the missing cover plate at north electric outlet in the foyer located at apt 6f, 6th story, 2nd apartment from south at westNov sent out
Oct 05, 2017Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 2nd room from east located at apt 6f, 6th story, 2nd apartment from south at westNov sent out
Oct 05, 2017Section 27-2005 adm code paint metal in accordance with dept. regulation the 1st door from north at east wall in the foyer located at apt 6f, 6th story, 2nd apartment from south at westNov sent out
Oct 05, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall in the foyer located at apt 6f, 6th story, 2nd apartment from south at westNov sent out
Oct 05, 2017Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south wall in the foyer located at apt 6f, 6th story, 2nd apartment from south at westNov sent out
Oct 05, 2017Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the west wall, ceiling in the bathroom located at apt 6f, 6th story, 2nd apartment from south at westNov sent out
Oct 05, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east, the bathroom located at apt 6f, 6th story, 2nd apartment from south at westNov sent out
Sep 05, 2017Section 27-2005 adm code refit entrance door to apt located at apt 6j, 6th story, 2nd apartment from south at west , section at northNov sent out
Sep 05, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all ceilings, walls, doors and trim in the entire apartment located at apt 6j, 6th story, 2nd apartment from south at west , section at northNov sent out
Sep 05, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 6th storyNov sent out

Property Owners and Associates

Farband Housing Corporation
Corporate Owner
0(0)

2 Properties

132 Units

Jlp Metro Management Inc.
Agent
2.5(15)

59 Properties

1731 Units

Joanna Jusino
Head Officer
0(0)

2 Properties

132 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet