951 Hoe Avenue,Bronx, NY 10459

164 Units

Built in 2005

8 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
1000 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 270 violations which is 1.64 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
31Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
152Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
87Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Mar 27, 2024§ 27-2005 hmc: properly repair or replace the broken or defective door at entrance in the 1st room from north at west located at apt 3q, 3rd story, 4th apartment from south at west , 1st section from west at northNov sent out
Mar 27, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3q, 3rd story, 4th apartment from south at west , 1st section from west at northNov sent out
Mar 27, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3q, 3rd story, 4th apartment from south at west , 1st section from west at northNov sent out
Mar 27, 2024§ 27-2005 hmc: properly repair or replace the broken or defective electric outlet (south -2) on south wall in the kitchen located at apt 3q, 3rd story, 4th apartment from south at west , 1st section from west at northNov sent out
Mar 27, 2024§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3q, 3rd story, 4th apartment from south at west , 1st section from west at northNov sent out
Mar 20, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling and all walls approx. 8 sq. feet in the 2nd bathroom from north located at apt 6s, 6th story, 1st apartment from south at west , section at southNotice of issuance sent to tenant
Mar 20, 2024§ 27-2005 hmc: properly repair or replace the broken or defective ventilation system at ceiling in the 2nd bathroom from north located at apt 6s, 6th story, 1st apartment from south at west , section at southNov sent out
Mar 20, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 6s, 6th story, 1st apartment from south at west , section at southNov sent out
Mar 20, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 6s, 6th story, 1st apartment from south at west , section at southNov sent out
Mar 20, 2024§ 27-2005 hmc: properly repair or replace the broken or defective ventilation system at ceiling in the 1st bathroom from north located at apt 6s, 6th story, 1st apartment from south at west , section at southNov sent out
Feb 28, 2024§ 27-2005 adm code replace with new the missing electric outlet safety caps / covers at west wall, south section at public hall, 7th storyNov sent out
Feb 28, 2024§ 27-2005 adm code replace with new the missing electric outlet safety caps /cover at west wall (north section) at public hall, 8th storyNov sent out
Feb 16, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 2 sq ft at ceiling in the 2nd room from east located at apt 8m, 8th story, 2nd apartment from north at eastNotice of issuance sent to tenant
Jan 21, 2024§ 27-2005 hmc: properly repair or replace the broken or defective exhaust fan at west wall in the bathroom located at apt 6e, 6th story, 1st apartment from south at west , section ''south''Nov sent out
Jan 21, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 8a, 8th story, 1st apartment from north at east , section ''south''Nov sent out
Jan 21, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 4 sq ft at window stool at west wall in the 2nd room from north located at apt 6e, 6th story, 1st apartment from south at west , section ''south''Notice of issuance sent to tenant
Jan 10, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 6 sq ft at ceiling in the bathroom located at apt 5s, 5th story, 1st apartment from north at eastNotice of issuance sent to tenant
Jan 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 5s, 5th story, 1st apartment from north at eastCiv14 mailed
Dec 14, 2023§ 27-2005 hmc: properly repair or replace the broken or defective ventilation fan at west wall in the bathroom located at apt 6e, 6th story, 1st apartment from south at west , 1st section from east at southCiv14 mailed
Dec 14, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 8k, 8th story, 5th apartment from south at westCiv14 mailed
Oct 15, 2023§ 27-2005 adm code replace with new the missing 2nd cabinet door from north, and 1st and 2nd cabinet drawers from north at sink base cabinet in the kitchen located at apt 4s, 4th story, 1st apartment from north at eastNov sent out
Oct 15, 2023§ 27-2005 hmc: properly repair or replace the broken or defective splinting wood bottom at sink base cabinet in the kitchen located at apt 4s, 4th story, 1st apartment from north at eastNov sent out
Jun 15, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the entire apartment located at apt 7r, 7th story, 4th apartment from north at eastNov sent out
Feb 17, 2022Section 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling approx 4 sq ft approx 1 sq ft at north wall and south approx 1 sq ft in the bathroom located at apt 6i, 6th story, 3rd apartment from south at westNotice of issuance sent to tenant
Nov 30, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at south wall in the private hallway located at apt 2s, 2nd story, 1st apartment from north at eastFirst no access to re- inspect violation
Nov 30, 2021Section 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 2 sq ft at north wall in the bathroom located at apt 2s, 2nd story, 1st apartment from north at eastFirst no access to re- inspect violation
Nov 30, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall in the bathroom located at apt 2s, 2nd story, 1st apartment from north at eastFirst no access to re- inspect violation
Nov 30, 2021Section 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at south wall approx. 2 sq. ft in the private hallway located at apt 2s, 2nd story, 1st apartment from north at eastFirst no access to re- inspect violation
Jun 23, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at north wall in the bathroom located at apt 4m, 4th story, 1st apartment from west at northFirst no access to re- inspect violation
Mar 10, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and all wall in the entire apartment located at apt 1h, 1st story, 2nd apartment from west at northFirst no access to re- inspect violation
Aug 16, 2018Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 6u, 6th story, 3rd apartment from north at eastNot complied with

Property Owners and Associates

Aldus Street Assoc LP
Corporate Owner
0(0)

3 Properties

300 Units

Hoe Avenue Associates
Corporate Owner
0(0)

3 Properties

300 Units

Knickerbocker Mgmt
Agent
2.2(6)

12 Properties

1079 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet