1040 Bushwick Avenue,Brooklyn, NY 11221

63 Units

Built in 1924

5 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
58 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 26 violations which is 0.41 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
12Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
7Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
7Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 09, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Mar 30, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 3rd room from north at east located at apt a44, 5th story, 1st apartment from east at southNov sent out
Dec 27, 2023§ 27-2005 adm code properly repair with similar material the broken or defective caulking around bathtub in the 1st bathroom from east located at apt a2, 1st story, 1st apartment from north at eastNov sent out
Dec 27, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt a2, 1st story, 1st apartment from north at eastNov sent out
Dec 20, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at bulkhead at public hall, 5th story, section ''a''Nov sent out
Nov 02, 2019§ 27-2005 adm code properly repair with similar material the broken or defective ceramic tile flooring at the watercloset area in the bathroom located at apt d21, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Nov 02, 2019§ 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles below the washbasin at the north wall in the bathroom located at apt d21, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Nov 02, 2019§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom located at apt d21, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Nov 02, 2019§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the private hallway located at apt d21, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Nov 02, 2019§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north at east located at apt d21, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Nov 02, 2019§ 27-2026 adm code repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt d21, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Nov 02, 2019§ 27-2026 adm code repair the leaky and/or defective faucets at the washbasin in the bathroom located at apt d21, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation

Property Owners and Associates

David Horton
Owner
3.1(2)

3 Properties

73 Units

Hortin Corporation
Lessee, Agent
3.1(2)

1 Property

63 Units

Matthew Horton
Site Manager
3.1(2)

1 Property

63 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Decent temporary space
Former Tenant
Pros:
Most neighbors are friendly and (c) openigloo o...
Cons:
Old building so toilets always (c) openigloo cl...
5-yr tenant, good experience
Former Tenant
Pros:
Responsive super, monthly pest control (c) open...
Cons:
Some of the repairs were (c) openigloo superfic...
Advice to owner:
No specific advice; see cons