Apr 09, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Mar 30, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 3rd room from north at east located at apt a44, 5th story, 1st apartment from east at southNov sent out
Dec 27, 2023§ 27-2005 adm code properly repair with similar material the broken or defective caulking around bathtub in the 1st bathroom from east located at apt a2, 1st story, 1st apartment from north at eastNov sent out
Dec 27, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt a2, 1st story, 1st apartment from north at eastNov sent out
Dec 20, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at bulkhead at public hall, 5th story, section ''a''Nov sent out
Nov 02, 2019§ 27-2005 adm code properly repair with similar material the broken or defective ceramic tile flooring at the watercloset area in the bathroom located at apt d21, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Nov 02, 2019§ 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles below the washbasin at the north wall in the bathroom located at apt d21, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Nov 02, 2019§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom located at apt d21, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Nov 02, 2019§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the private hallway located at apt d21, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Nov 02, 2019§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north at east located at apt d21, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Nov 02, 2019§ 27-2026 adm code repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt d21, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Nov 02, 2019§ 27-2026 adm code repair the leaky and/or defective faucets at the washbasin in the bathroom located at apt d21, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation