130 Lenox Road,Brooklyn, NY 11226

59 Units

Built in 1931

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
377 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 85 violations which is 1.44 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
15Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
46Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
24Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Feb 23, 2024§ 27-2005 hmc: properly repair or replace the broken or defective closet door in the 3rd room from east located at apt a2, 1st story, 1st apartment from west at northNov sent out
Feb 23, 2024§ 27-2005 hmc: properly repair or replace the broken or defective eletrical light switch at west wall in the private hallway located at apt a2, 1st story, 1st apartment from west at northNov sent out
Feb 23, 2024§ 27-2005 hmc: properly repair or replace the broken or defective base cabinet draw at sink in the kitchen located at apt a2, 1st story, 1st apartment from west at northNov sent out
Feb 21, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation at 1st riser from south at west wall in the bathroom located at apt f8, 6th story, 1st apartment from south at westNov sent out
Feb 21, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation at 1st riser from east at south wall in the 4th room from east located at apt f8, 6th story, 1st apartment from south at westNov sent out
Jan 24, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 2 sq ft at west wall in the 1st room from north located at apt f10, 6th story, 3rd apartment from south at westNotice of issuance sent to tenant
Dec 31, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 2 square at window recess south wall in the bathroom located at apt a3, 1st story, 1st apartment from north at eastNotice of issuance sent to tenant
Dec 31, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 5 square feet at ceiling in the bathroom located at apt a3, 1st story, 1st apartment from north at eastNotice of issuance sent to tenant
Nov 02, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation steam riser and steam radiator in the bathroom located at apt c6, 3rd story, 2nd apartment from north at eastInvalid certification
Nov 02, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls in the 1st room from east at south located at apt c6, 3rd story, 2nd apartment from north at eastInvalid certification
Nov 02, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls in the bathroom located at apt c6, 3rd story, 2nd apartment from north at eastInvalid certification
Nov 02, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at east wall apprx 1 square feet in the bathroom located at apt c6, 3rd story, 2nd apartment from north at eastCiv14 mailed
Apr 27, 2022Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration .. suspended acoustical tiles at ceiling in the bathroom located at apt e6, 5th story, 1st apartment from north at eastNot complied with
Sep 03, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt f3, 6th story, 1st apartment from west at northNot complied with
Dec 11, 2019Section 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt f3, 6th story, 2nd apartment from west at north , section at northNot complied with

Property Owners and Associates

Anton Reynolds
Site Manager, Officer
2.3(42)

24 Properties

1173 Units

Joe Gugenhime
Head Officer
2.2(13)

12 Properties

606 Units

Msk130 LLC
Owner, Corporate Owner, Agent
1.5(3)

2 Properties

95 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

THIS BUILDING IS THE WORST
Former Tenant
Pros:
The only thing I like (c) openigloo about this ...
Cons:
EVERYTHING and I'm not even (c) openigloo being...
Advice to owner:
At least fix things around so when you enter th...
Leaks, Rats, Thieves
Former Tenant
Pros:
The building is a very (c) openigloo old buildi...
Cons:
Stay away they steal packages (c) openigloo and...
Advice to owner:
Sell it to someone who cares about their tenants