1985 Ocean Avenue,Brooklyn, NY 11210

47 Units

Built in 1948

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
76 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 123 violations which is 2.61 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
23Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
67Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
33Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 11, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Jan 12, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the bathroom located at apt 6a, 6th story, 1st apartment from east at south , section ''west''Civ14 mailed
Jan 12, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at north wall, west wall, south wall, east wall, 1st window frame from north at east wall, ceiling in the bathroom located at apt 6a, 6th story, 1st apartment from east at south , section ''west''Civ14 mailed
Jan 12, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation at 1st riser from east at south wall in the bathroom located at apt 6a, 6th story, 1st apartment from east at south , section ''west''Civ14 mailed
Jan 12, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the private hallway , the 2nd room from north at east, the 2nd room from north at west, the kitchen located at apt 6a, 6th story, 1st apartment from east at south , section ''west''Civ14 mailed
Jan 12, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ( approxinately 9 sft) south wall in the bathroom located at apt 6a, 6th story, 1st apartment from east at south , section ''west''Notice of issuance sent to tenant
Jan 12, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ( approximately 9 sqft ) east wall in the bathroom located at apt 6a, 6th story, 1st apartment from east at south , section ''west''Notice of issuance sent to tenant
Jan 12, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ( approxinately 2sqft ) ceiling in the bathroom located at apt 6a, 6th story, 1st apartment from east at south , section ''west''Notice of issuance sent to tenant
Jan 12, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at approximately 2sqft) east wall in the 2nd room from north at east located at apt 6a, 6th story, 1st apartment from east at south , section ''west''Notice of issuance sent to tenant
Jan 12, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ( approximately 1sq ft) 1st window frame from north at east wall in the 2nd room from north at east located at apt 6a, 6th story, 1st apartment from east at south , section ''west''Notice of issuance sent to tenant
Jan 12, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ( approximately 2sqft) 1st window frame from east at south wall in the 2nd room from north at west located at apt 6a, 6th story, 1st apartment from east at south , section ''west''Notice of issuance sent to tenant
Jan 12, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from east at south wall in the bathroom located at apt 6a, 6th story, 1st apartment from east at south , section ''west''Civ14 mailed
Jan 12, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom located at apt 6a, 6th story, 1st apartment from east at south , section ''west''Civ14 mailed
Jan 12, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt 6a, 6th story, 1st apartment from east at south , section ''west''Civ14 mailed
Jan 12, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ( approximately 1 sqft ) south wall in the 2nd room from north at east located at apt 6a, 6th story, 1st apartment from east at south , section ''west''Notice of issuance sent to tenant
Sep 29, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st closet from east at south wall door in the foyer located at apt 4c, 4th story, 2nd apartment from south at westNov sent out
Sep 29, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at north, the 1st room from east, the private hallway , the kitchen , the bathroom located at apt 4c, 4th story, 2nd apartment from south at westNov sent out
Apr 21, 2021Section 27-2011 adm code cleanse to the satisfaction of this department the floor at public hall, 1st storyNov sent out
Apr 21, 2021Section 27-2011 adm code cleanse to the satisfaction of this department the floor at public hall, 1st storyNov sent out
Sep 08, 2019Section 27-2005 adm code replace with new the missing safety caps or covers for electric outlets at north-south and east walls at public hall, 1st storyNov sent out
Nov 30, 2018Section 27-2005 adm code replace with new the missing electrical outlet safety covers/caps at public hall, 3rd storyNov sent out
Nov 28, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the private hallway , the kitchen , the 3rd room from east at north, the bathroom located at apt 4c, 4th story, 2nd apartment from south at westNov sent out
Aug 14, 2014Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration , apartment converted to dental office located at apt 1e, 1st story, 2nd apartment from west at northNot complied with

Property Owners and Associates

1985 Ocean, LLC
Corporate Owner
1.9(3)

2 Properties

95 Units

Mark Rubin
Agent, Head Officer
1.9(3)

2 Properties

95 Units

Michael Klein
Site Manager
1.8(1)

1 Property

47 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

At least the neighborhood is safe and somewhat accessible.
Former Tenant
Pros:
Top floor unit gets a (c) openigloo lot of sunl...
Cons:
Neighbors wouldn't throw trash down (c) openigl...