Apr 11, 2024§ 27-2005 adm code properly repair with similar material the broken or defective lock at vestibule door at public hall, 1st storyNov sent out
Feb 07, 2024§ 27-2005 adm code properly repair with similar material the broken or defective at wooded subfloor in the kitchen located at apt 1a, 1st story, 1st apartment from west at northNov sent out
Jul 14, 2022Section 27-2005 adm code paint metal in accordance with dept. regulation steam riser pipe in the bathroom located at apt 3b, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Jul 14, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 3b, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Jul 14, 2022Section 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glazed at bathtub in the bathroom located at apt 3b, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Aug 02, 2021Section 27-2005 adm code properly repair with similar material the broken or defective caulking around water closet base in the bathroom located at apt 1a, 1st story, 1st apartment from west at northFirst no access to re- inspect violation