22-29 Dix Avenue,Queens, NY 11691

27 Units

Built in 1998

3 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
160 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 196 violations which is 7.25 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
27Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
118Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
51Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Sep 30, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic tile at floor in the kitchen located at apt 4a, 4th story, 1st apartment from south at westNov sent out
Aug 20, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 4a, 4th story, 1st apartment from south at westNov sent out
Aug 20, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department west, east, and south walls in the 1st room from north located at apt 4a, 4th story, 1st apartment from south at westNov sent out
Aug 20, 2023§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 4a, 4th story, 1st apartment from south at westNov sent out
Aug 20, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the 1st room from north located at apt 4a, 4th story, 1st apartment from south at westNov sent out
Mar 26, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling at public hall, 4th storyNov sent out
Mar 26, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 1b, 1st story, 5th apartment from north at eastNov sent out
Mar 26, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallway located at apt 3f, 3rd story, 3rd apartment from south at westNov sent out
Feb 27, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department east wall at public hall, 2nd storyNov sent out
Feb 15, 2023Section 27-2005 adm code replace with new the missing closet door in the 1st room from east located at apt 4c, 4th story, 3rd apartment from north at eastNov sent out
Feb 15, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department east wall at public hall, 2nd storyNov sent out
Dec 13, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department east wall. at public hall, 2nd storyNov sent out
Oct 30, 2022Section 27-2005 adm code replace with new the broken or defective entrance door in the bathroom located at apt 2c, 2nd story, 3rd apartment from north at eastNov sent out
Oct 12, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east at north located at apt 3f, 3rd story, 3rd apartment from west at northNov sent out
Oct 12, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 3f, 3rd story, 3rd apartment from west at northNov sent out
May 18, 2022Section 27-2011 adm code cleanse to the satisfaction of this department the all stories at fire stairsNov sent out
May 18, 2022Section 27-2011 adm code cleanse to the satisfaction of this department the around bathtub in the bathroom located at apt 2a, 2nd story, 1st apartment from south at westNov sent out
Aug 04, 2021Section 27-2005 adm code refit door in the bathroom located at apt 1b, 1st story, 5th apartment from south at westNov sent out
Aug 04, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling &all walls in the bathroom located at apt 1b, 1st story, 5th apartment from south at westNov sent out
May 14, 2021Section 27-2005 adm code refit fire door at west fire stairs , 1st storyNot complied with
Apr 15, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 1h, 1st story, 2nd apartment from south at westNov sent out
Apr 15, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 1h, 1st story, 2nd apartment from south at westNov sent out
Nov 01, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department cabinets in the kitchen located at apt 1h, 1st story, 2nd apartment from west at northNov sent out
Nov 01, 2020Section 27-2005 adm code paint metal in accordance with dept. regulation radiators in the entire apartment located at apt 1h, 1st story, 2nd apartment from west at northNov sent out
Nov 01, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the entire apartment located at apt 1h, 1st story, 2nd apartment from west at northNov sent out
Jul 28, 2020Section 27-2005 adm code properly repair with similar material the broken or defective paint and or reglaze the porcelain at bathtub in the bathroom located at apt 1e, 1st story, 2nd apartment from north at eastNov sent out
Jul 27, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the entire apartment located at apt 1h, 1st story, 2nd apartment from south at westNov sent out

Property Owners and Associates

Aja Jusino
Site Manager
0(0)

1 Property

27 Units

John Crotty
Officer
2.8(2)

50 Properties

910 Units

John Crotty
Head Officer
2.7(5)

79 Properties

1196 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet