Buildings with low rent increases near the QM40 bus in NYC
Find buildings near the QM40 bus in NYC where rent increases are typically lower. This page currently covers 114+ buildings, filtered by the low-rent-increases criteria plus the QM40 bus area. Openigloo helps you narrow the search using building-level signals and renter-to-renter info. Use the available units feed, cross-check building details, and read Openigloo reviews and any tenant Q&A so you can ask better questions before signing a lease.
Buildings with low rent increases near the QM40 bus in NYC
Showing 1–18 of 114 buildings with low rent increases near the QM40 bus in NYC.

330 East 39 Street
Murray Hill

301 East 47 Street
Turtle Bay

279 East 44 Street
Turtle Bay

150 East 44 Street
Turtle Bay
207 East 37 Street
Murray Hill
350 East 52 Street
Turtle Bay

245 E 44 St
Turtle Bay
324 East 52 Street
Turtle Bay

136 East 55 Street
Sutton Place
222 E 39 St
Murray Hill

137 East 38 Street
Murray Hill
62-60 99 Street
Rego Park

225 East 39 Street
Murray Hill

301 East 38 Street
Murray Hill
/-73.970505,40.748593,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
25 Tudor City Place
Murray Hill

241 East 50 Street
Turtle Bay
/-73.969595,40.753952,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
249 E 48 St
Turtle Bay

65-70 Austin Street
Rego Park
What to check before choosing a building with low rent increases near the QM40 bus in NYC
- Confirm the exact cross-streets and how the commute works for you along the QM40 corridor.
- If the building is flagged for low rent increases, still verify rent history and any renewal terms directly with management.
- Compare the full monthly cost, not just the asking rent (broker fee, deposit, and utilities can change the total).
- Check practical move-in details early: availability date, required documents, and any move-in/out fees.
- Read what renters mention about maintenance response and building services, then ask follow-ups through the building’s contact process.