Pre-war buildings near the 1 train in NYC
Browse pre-war buildings near the 1 train in NYC, with 10,805+ buildings matching your filters. This page narrows to buildings built before 1947 and located along the 1 train corridor so you can compare commute-ready options. Openigloo helps you evaluate buildings faster with renter-first context: building pages with what’s available now, aggregated scores from rated buildings, and open-data signals paired with tenant Q&A so you can verify details directly with the building before you sign a lease.
Pre-war buildings near the 1 train in NYC
Showing 6,535–6,552 of 10,805 pre-war buildings near the 1 train in NYC.
635 Riverside Drive
Hamilton Heights
212 West 91 Street
Upper West Side
236 West 16 Street
Chelsea
215 West 109 Street
All Upper West Side
245 West 51 Street
Midtown
24 5 Avenue
Greenwich Village
426 West 47 Street
Hell's Kitchen
3139 Broadway
Morningside Heights
425 Riverside Drive
Morningside Heights
3489 Broadway
Hamilton Heights
181 Prince Street
Soho
517 West 113 Street
Morningside Heights
189 Claremont Avenue
Morningside Heights
101 West 55 Street
Midtown
250 West 85 Street
Upper West Side
414 West 44 Street
Hell's Kitchen
/-73.987662,40.763992,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
355 West 51 Street
Hell's Kitchen
309 West 57 Street
Hell's Kitchen
What to check before for pre-war buildings near the 1 train in NYC
- Confirm the exact walking time to your preferred 1 line stop, since “near” can vary by block.
- For pre-war buildings, ask about radiator/boiler type, insulation, and noise (old construction can mean different baseline comfort).
- Check for elevator availability, laundry access, and current unit layout/finishes; pre-war buildings can vary widely floor to floor.
- Use the building page signals and tenant Q&A, then contact management for the latest: monthly cost, move-in fees, and any policies that affect your lease terms.
- If you’re sharing documentation (income, employment, guarantors), ask what’s required up front to avoid delays. Requirements can differ by building even with similar corridors.