Buildings with heat and hot water included near the M50 bus in NYC
This page tracks NYC buildings that meet two filters: heat + hot water included and the M50 bus corridor (m50-bus). You’re starting with 102+ buildings, so you can narrow by building details before you tour. Openigloo makes it easier to compare buildings using resident-first signals like ratings, building notes, and tenant Q&A. You can also check open-data and context indicators, then message the building to confirm what’s included and how utilities are handled for each lease.
Buildings with heat and hot water included near the M50 bus in NYC
Showing 37–54 of 102 buildings with heat and hot water included near the M50 bus in NYC.
805 8 Avenue
Hell's Kitchen
330 West 45 Street
Hell's Kitchen
321 West 54 Street
Hell's Kitchen
225 East 46 Street
Turtle Bay

46-15 Center Boulevard
Hunters Point
301 West 45 Street
Hell's Kitchen
324 East 52 Street
Turtle Bay

245 West 51 Street
Midtown

426 West 47 Street
Hell's Kitchen
350 W 50 St
Hell's Kitchen
414 West 44 Street
Hell's Kitchen
/-73.987662,40.763992,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
355 West 51 Street
Hell's Kitchen
888 8 Avenue
Midtown
407 West 51 Street
Hell's Kitchen
301 E 53 St
Sutton Place

320 East 46 Street
Turtle Bay
/-73.971423,40.756669,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
569 Lexington Avenue
Turtle Bay
328 West 44 Street
Hell's Kitchen
What to check before choosing a building with heat and hot water included near the M50 bus in NYC
- Expect some utilities to be included, but still confirm the exact scope: heat, hot water, and any limits or seasonal start/stop dates.
- Verify how the building bills other utilities (cooking fuel, electricity, A/C if applicable) since “included” typically applies only to listed services.
- Check lease terms for enrollment and control: radiator access, thermostats, and whether hot water is constant or timed by building systems.
- Use Openigloo’s building signals (ratings and tenant Q&A) to spot recurring issues like maintenance response times or how inclusion is enforced.
- Before signing, ask about any move-in costs and documentation requirements; included utilities can change what you budget, but not all fees.