Buildings highly rated for pest control near the 2 train in Manhattan
This page helps you find buildings highly rated for pest control near the 2 train in Manhattan. The eligible scope includes 479+ buildings that match the “2-train” location filter and the “best-pest-control” rating filter. Openigloo brings together renter-first building research: pest-control–related signals from available records, Openigloo review scores, and community tenant Q&A. Use the building pages to compare what matters for your move-in timeline, then confirm details directly with the building before you sign a lease.
Buildings highly rated for pest control near the 2 train in Manhattan
Showing 55–72 of 479 buildings highly rated for pest control near the 2 train in Manhattan.
303 West 21 Street
Chelsea

123 Washington Street
Financial District
/-73.94438,40.815851,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
209 West 135 Street
Central Harlem
330 West 45 Street
Hell's Kitchen
140 Riverside Boulevard
All Upper West Side

200 W 70 St
All Upper West Side
235 West 63 Street
All Upper West Side

189 West 89 Street
Upper West Side

88 Leonard Street
Tribeca

145 West 67 Street
All Upper West Side

20 West Street
Financial District
406 West 31 Street
Hudson Yards
56 West 125 Street
South Harlem

95 Horatio Street
West Village
42 West 33 Street
Midtown South
301 West 45 Street
Hell's Kitchen

69 East 125 Street
Central Harlem
600 Columbus Avenue
Upper West Side
What to check before for buildings highly rated for pest control near the 2 train in Manhattan
- Use the filters together (2-train + best-pest-control) to narrow to buildings with stronger pest-control performance signals near 2-line access.
- On each building page, check the pest-control score context (what the signal reflects) alongside recent tenant Q&A about response times and follow-through.
- Ask the building for the current pest-management plan: frequency, typical treatment steps, and what happens after a reported issue.
- Confirm building-specific rules and practical details that affect outcomes (access for treatments, notice windows, and how units are prepared during service).
- If you’re scheduling move-in, ask whether there’s an upcoming inspection/treatment window so you can coordinate keys, entry access, and timing.