Buildings with heat and hot water included near Urban Assembly School of Design and Construction, The in NYC
These listings cover buildings with heat and hot water included near Urban Assembly School of Design and Construction, The, with 72+ buildings in NYC that match this filter pair on Openigloo. Openigloo helps you narrow faster using building signals like past tenant Q&A, review notes, and open-record based details where available. Before you tour, still confirm the exact utilities included, any tenant responsibilities, and the start date for the heating season in your lease.
Buildings with heat and hot water included near Urban Assembly School of Design and Construction, The in NYC
Showing 1–18 of 72 buildings with heat and hot water included near Urban Assembly School of Design and Construction, The in NYC.

635 West 42 Street
Hell's Kitchen
606 West 57 Street
Hell's Kitchen
747 10 Avenue
Hell's Kitchen

605 West 42 Street
Hell's Kitchen

350 West 43 Street
Hell's Kitchen
410 West 53 Street
Hell's Kitchen

330 West 56 Street
Hell's Kitchen

561 10 Avenue
Hell's Kitchen

424 West 42 Street
Hell's Kitchen

305 West 50 Street
Hell's Kitchen
610 West 42 Street
Hell's Kitchen
560 West 43 Street
Hell's Kitchen

300 West 55 Street
Hell's Kitchen
601 West 57 Street
Hell's Kitchen

271 West 47 Street
Midtown
260 West 52 Street
Midtown
440 West 47 Street
Hell's Kitchen
555 10 Avenue
Hudson Yards
What to check before for buildings with heat and hot water included near Urban Assembly School of Design and Construction, The in NYC
- Expect monthly rent to reflect heat and hot water included, but confirm what’s covered (base heat vs. supplemental heating; hot water limits if any).
- Verify the heating/hot-water start and end dates in writing, plus any rules for outages and how quickly the building must respond.
- Check whether other utilities are separate (cooking gas, electric, internet/cable) so your full monthly cost stays predictable.
- Use Openigloo’s tenant Q&A and reviews to flag recurring issues like boiler performance, hot-water pressure, or maintenance response time.
- Before signing, ask for the most recent utility practices for the specific unit type (studio/1BR) and any special conditions noted by the building.