Buildings with low open violation rates near the M11 bus in NYC
This page gathers NYC buildings with low open-violation rates and locations near the M11 bus, totaling 3,183+ buildings right now. Use it to narrow by open-record signals tied to building conditions while you compare options that match your commute. Openigloo pairs building pages with renter-first context: you can review rated buildings, see what tenants flag in Q&A, and cross-check open-data violation signals with the building’s own paperwork and explanations before you sign a lease.
Buildings with low open violation rates near the M11 bus in NYC
Showing 1,765–1,782 of 3,183 buildings with low open violation rates near the M11 bus in NYC.
341 West 45 Street
Hell's Kitchen
415 West 51 Street
Hell's Kitchen
1 Columbus Place
Hell's Kitchen
525 West 52 Street
Hell's Kitchen
300 West 49 Street
Hell's Kitchen
460 West 20 Street
West Chelsea
330 West 45 Street
Hell's Kitchen
140 Riverside Boulevard
All Upper West Side
400 West 119 Street
Morningside Heights
45 Tiemann Place
Morningside Heights
244 West 72 Street
All Upper West Side
752 W End Ave
Upper West Side
145 West 67 Street
All Upper West Side
118 West 114 Street
South Harlem
102 Convent Avenue
West Harlem
600 Columbus Avenue
Upper West Side
236 West 16 Street
Chelsea
245 West 51 Street
Midtown
What to check before for buildings with low open violation rates near the M11 bus in NYC
- Use the “low-open-violations” signal as a starting point, then confirm details directly with the managing agent (what was corrected, current status, and documentation).
- When a building is flagged through open records, ask what tenants should expect day to day and whether there’s an active plan for outstanding items.
- Compare similar buildings around the same M11 corridor: look at maintenance responsiveness mentioned in Q&A, not just the violation count.
- Verify lease terms and move-in costs even if the building’s record looks clean (deposits, broker fees, and any utility responsibilities).
- If you have health or mobility needs, ask about access, ventilation, and pest-control practices in writing during the application process.