Buildings with low historical violations near the 3 train in NYC
Find buildings with low historical violations near the 3 train in NYC. This page includes 601+ buildings that match both filters, so you can narrow your search by transit proximity and public violation signals. Openigloo helps you compare options faster using building-level data plus renter-focused inputs like Openigloo ratings from rated buildings, and what tenants flag in reviews and Q&A. Use the results as a starting point, then confirm current conditions and policies directly with the building or super before signing a lease.
Buildings with low historical violations near the 3 train in NYC
Showing 145–162 of 601 buildings with low historical violations near the 3 train in NYC.
/-74.002739,40.741778,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
331 West 16 Street
Chelsea

2 Gold Street
Financial District

200 Water St
Fulton/Seaport

95 Wall Street
Financial District

63 Wall Street
Financial District

50 West 34 Street
Midtown South

20 Exchange Place
Financial District

1 West Street
Financial District

50 Murray Street
Tribeca

333 Schermerhorn Street
Downtown Brooklyn

343 Gold Street
Downtown Brooklyn

33 Bond Street
Downtown Brooklyn

88 Fulton Street
Fulton/Seaport

100 Maiden Lane
Financial District

45 Wall Street
Financial District

90 Washington Street
Financial District

350 West 43 Street
Hell's Kitchen

436 Albee Square
Downtown Brooklyn
What to check before for buildings with low historical violations near the 3 train in NYC
- Expect the “low-historic-violations” filter to reflect patterns from NYC open records, not a live inspection—still ask about current maintenance, pests, and complaint history.
- Use “near the 3 train” as a commute filter, then double-check the exact stop and walking time for your daily route.
- Confirm which fees apply beyond rent (application fees, move-in fees, broker fees if any, security deposit) and what documents you’ll need for approval.
- Ask how the building handles recurring issues (super response times, inspections, vendor schedules) and whether there are recent remediation reports you can review.
- If you have specific constraints (timing, unit condition, accessibility needs), verify them in writing before you commit.