Buildings with heat and hot water included near the M10 bus in NYC
This page helps you find NYC buildings with heat and hot water included, filtered for locations near the M10 bus line. There are 281+ eligible buildings right now, so you can compare options without guessing how utilities may work. On Openigloo, you can use ratings, review details, and building-level notes to sanity-check what you’re looking at before you tour. You can also read tenant Q&A and look at open-data signals tied to each building to narrow down which spots match your commute and your budget.
Buildings with heat and hot water included near the M10 bus in NYC
Showing 1–18 of 281 buildings with heat and hot water included near the M10 bus in NYC.

3333 Broadway
Manhattanville

606 West 57 Street
Hell's Kitchen
747 10 Avenue
Hell's Kitchen

410 St Nicholas Avenue
Central Harlem

410 West 53 Street
Hell's Kitchen

330 West 56 Street
Hell's Kitchen

248 West 64 Street
All Upper West Side

205 W 103 St
All Upper West Side

509 Cathedral Parkway
Morningside Heights

305 West 50 Street
Hell's Kitchen

75 West End Avenue
All Upper West Side

211 West 56 Street
Midtown

180 Riverside Boulevard
All Upper West Side

300 West 55 Street
Hell's Kitchen

155 W 68 St
All Upper West Side

60 West 66 Street
All Upper West Side

601 West 57 Street
Hell's Kitchen

235 West 56 Street
Midtown
What to check before choosing a building with heat and hot water included near the M10 bus in NYC
- Confirm the exact wording: “heat included,” “hot water included,” and whether it’s for all units or specific floor plans.
- Ask how non-heat utilities are handled (often cooking, electricity, and internet are separate). Check the monthly cost beyond rent.
- Look up building policies that affect your move-in: deposits, required documentation, and whether any fees apply even when utilities are included.
- Use tenant Q&A to learn what “included” looks like in real life (thermostat control, response times for repairs, and hot-water consistency).
- Before signing, verify lease terms that can affect total cost: renewal/termination timing, any utility-related addenda, and how the building bills for exceptions.