Good cause buildings near the 2 train in Manhattan
Good cause buildings near the 2 train in Manhattan: browse 4,365+ buildings that match this multi-filter scope. “Good cause” focuses on tenant protections around certain rent increases and non-renewals, so it helps you screen for buildings with stronger guardrails. Openigloo helps you narrow faster by pairing building data with renter-first signals like ratings, review history, and tenant Q&A. Use the listings currently advertised at each building to pressure-test commute fit, unit details, and what’s written in the lease before you apply.
Good cause buildings near the 2 train in Manhattan
Showing 2,431–2,448 of 4,365 good cause buildings near the 2 train in Manhattan.
80 North Moore Street
Tribeca

313 West 33 Street
Hudson Yards
561 Amsterdam Avenue
Upper West Side
323 West 96 Street
Upper West Side
15 Cliff Street
Fulton/Seaport
21 West Street
Financial District
40 Harrison Street
Tribeca
784 Columbus Avenue
Upper West Side

1295 5 Avenue
South Harlem
160 Riverside Boulevard
All Upper West Side
304 West 92 Street
Upper West Side
101 West 15 Street
Chelsea
200 West 26 Street
Chelsea
101 West 90 Street
Upper West Side
370 West 30 Street
Chelsea
1660 Madison Avenue
South Harlem
301 West 19 Street
Chelsea
150 West 47 Street
Midtown
What to check before for good cause buildings near the 2 train in Manhattan
- Confirm what “good cause” means for your specific situation: ask how renewal works and what documentation they require for tenant protections.
- Filter for practical commute details beyond “near the 2 train” (walking time, transfer options, and late-night routes) and verify the building’s exact address.
- Read recent tenant Q&A and building notes on maintenance responsiveness and noise patterns, then match those comments to the unit you’re considering.
- Before signing, confirm total move-in costs (deposit, broker fee if applicable, and any required fees) and the lease terms shown for the available unit.
- If you’re considering availability windows, check that the specific advertised unit aligns with your timeline and budget rather than relying only on building-level details.