Buildings with heat and hot water included near the M2 bus in Manhattan
This page covers 270+ Manhattan buildings where heat and hot water are included, focused on the M2 bus corridor. Use the combined heat-hot-water-included + m2-bus filter to narrow down buildings based on utilities coverage and location. Openigloo helps you compare buildings with details pulled from listings plus tenant-facing signals like reviews, building pages, and practical Q&A. Still, building rules can vary, so use the info here to start your questions early and verify what’s included for the exact unit.
Buildings with heat and hot water included near the M2 bus in Manhattan
Showing 19–36 of 270 buildings with heat and hot water included near the M2 bus in Manhattan.
92 2 Avenue
East Village
346 E 13 St
East Village
/-73.966895,40.802431,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
246 West 108 Street
All Upper West Side

1510 Lexington Avenue
Carnegie Hill
1309 5 Avenue
South Harlem
56 St Marks Place
East Village

120 East 10 Street
East Village
408 West 130 Street
West Harlem
60 East 12 Street
Greenwich Village

9 West 31 Street
Midtown South
1 University Place
Greenwich Village

45 Tiemann Place
Morningside Heights

166 2 Avenue
East Village
118 West 114 Street
South Harlem
85 4 Avenue
East Village
31 East 31 Street
Midtown East

345 East 12 Street
East Village
30 West 18 Street
Flatiron
What to check before choosing a building with heat and hot water included near the M2 bus in Manhattan
- Confirm the utility terms in writing for your specific lease (heat only vs heat + hot water; any seasonal start/stop rules).
- Ask whether the building bills any utilities in a different way (for example, hot water timing or submetering) even when the listing says “included.”
- Verify the address is actually served by your walking route to the M2 bus stops you care about, especially if you’re commuting at specific times.
- Check move-in requirements tied to utilities access (unit entry scheduling, boiler/water access notes, and any maintenance windows).
- Before you sign, request the latest utility-included policy or addendum and clarify whether it can change during renewal.