Buildings with heat and hot water included near the M2 bus in Manhattan
This page covers 270+ Manhattan buildings where heat and hot water are included, focused on the M2 bus corridor. Use the combined heat-hot-water-included + m2-bus filter to narrow down buildings based on utilities coverage and location. Openigloo helps you compare buildings with details pulled from listings plus tenant-facing signals like reviews, building pages, and practical Q&A. Still, building rules can vary, so use the info here to start your questions early and verify what’s included for the exact unit.
Buildings with heat and hot water included near the M2 bus in Manhattan
Showing 1–18 of 270 buildings with heat and hot water included near the M2 bus in Manhattan.

410 St Nicholas Avenue
Central Harlem

205 W 103 St
All Upper West Side

509 Cathedral Parkway
Morningside Heights

60 West 23 Street
Flatiron

23 East 30 Street
NoMad
77 St Marks Place
East Village

88 East 4 Street
East Village

205 East 95 Street
Yorkville

1295 5 Avenue
South Harlem
/-73.949223,40.830631,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
736 Riverside Drive
Hamilton Heights
145 4 Avenue
East Village

200 E 72 St
Lenox Hill
1 Irving Place
Gramercy Park

295 Park Avenue South
Gramercy Park
1660 Madison Avenue
South Harlem

175 E 96 St
Carnegie Hill

117 East 7 Street
East Village
145 East 16 Street
Gramercy Park
What to check before choosing a building with heat and hot water included near the M2 bus in Manhattan
- Confirm the utility terms in writing for your specific lease (heat only vs heat + hot water; any seasonal start/stop rules).
- Ask whether the building bills any utilities in a different way (for example, hot water timing or submetering) even when the listing says “included.”
- Verify the address is actually served by your walking route to the M2 bus stops you care about, especially if you’re commuting at specific times.
- Check move-in requirements tied to utilities access (unit entry scheduling, boiler/water access notes, and any maintenance windows).
- Before you sign, request the latest utility-included policy or addendum and clarify whether it can change during renewal.