Good cause buildings near 33 St station in NYC
Good cause buildings near 33 St station in NYC—browse 509+ eligible buildings and compare what’s available right now. This filter groups buildings under tenant protections tied to “good cause,” including limits on certain rent increases and non-renewals. Openigloo helps you move faster with building-level details, tenant Q&A, and review signals where available. You can also cross-check open-data indicators so you know what to ask the landlord or managing agent before you sign a lease.
Good cause buildings near 33 St station in NYC
Showing 163–180 of 509 good cause buildings near 33 St station in NYC.

195 Lexington Avenue
Kips Bay

230 East 30 Street
Kips Bay

300 East 34 Street
Kips Bay

155 East 29 Street
Kips Bay

30 Park Avenue
Murray Hill

4 Park Avenue
Midtown East

300 E 39Th St
Murray Hill

23 East 30 Street
NoMad

480 2 Avenue
Kips Bay

247 East 28 Street
Kips Bay

120 East 34 Street
Midtown East

150 East 34 Street
Kips Bay

340 East 34 Street
Kips Bay

200 E 33 St
Kips Bay
207 East 37 Street
Murray Hill

150 East 39 Street
Murray Hill
222 E 34 St
Kips Bay

49 East 34 Street
Murray Hill
What to check before choosing a good cause building near 33 St station in NYC
- Use this page to narrow by the good cause protection category, then verify the building’s specific situation with the managing agent (lease terms, renewal expectations, and how increases are handled).
- Confirm practical move-in details: current availability, total move-in costs (security deposit and any broker-related fees), and any required documentation for eligibility.
- Check lease logistics early: start date flexibility, how rent is collected, and what happens at renewal under the building’s current policy.
- Look for quality signals on Openigloo for each building (rated buildings plus tenant Q&A). Treat them as guidance, not a substitute for a live walkthrough or direct questions.
- If a building also lists restrictions (for example, around pets, smoking, or shared spaces), ask for them in writing before you apply, since rules can vary by building even inside the same protection category.