Buildings with heat and hot water included near the R train in NYC
Find NYC buildings with heat and hot water included near the R train. This page covers 528+ buildings that match the multi-filter pair, so you can focus on one big utility cost upfront. Openigloo helps you narrow the list using what’s publicly available and what renters share. You’ll see building-level info, Openigloo ratings signals where available, and tenant Q&A prompts to help you verify what’s included before you sign—especially around heating schedules and hot-water setup.
Buildings with heat and hot water included near the R train in NYC
Showing 163–180 of 528 buildings with heat and hot water included near the R train in NYC.
96 Sterling Place
Park Slope
442 3 Avenue
Kips Bay
142 East 27 Street
Kips Bay
10 East 29 Street
NoMad
11 East 1 Street
East Village
310 Greenwich Street
Tribeca
150 East 57 Street
Sutton Place
136 East 55 Street
Sutton Place
245 West 51 Street
Midtown
235 East 13 Street
East Village
426 West 47 Street
Hell's Kitchen
181 Prince Street
Soho
350 W 50 St
Hell's Kitchen
1373 Avenue Of The Americas
Midtown
414 West 44 Street
Hell's Kitchen
/-73.987662,40.763992,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
355 West 51 Street
Hell's Kitchen
309 West 57 Street
Hell's Kitchen
206 East 26 Street
Kips Bay
What to check before for buildings with heat and hot water included near the R train in NYC
- Confirm the exact utilities covered: heat and hot water included can still vary by building system, boiler timing, and any scheduled shutoffs.
- Ask how hot water is provided (central system vs. unit-based) and whether there are any restrictions during maintenance windows.
- Check lease terms beyond utilities: rent start date, security deposit, and any move-in fees or building-required documentation.
- Look for clarity on resident responsibilities (thermostat control, radiator access, or any billing for unusually high usage, if applicable).
- Use Openigloo to compare multiple buildings quickly, then message the super/management for the final “what’s included” confirmation in writing.