Buildings with heat and hot water included near the SIM10 bus in Gramercy Park
Gramercy Park is a Manhattan neighborhood search scope on Openigloo for renters who want building-level details near the SIM10 bus while filtering for heat and hot water included. On this page, you’re browsing 19+ eligible buildings. For Gramercy Park, Openigloo shows an average building rating of 3.5/5 across 86 rated buildings (building-level trends; individual units can differ)
These buildings in Gramercy Park match two filters: heat + hot water included and SIM10 bus proximity. You’re looking at 19+ eligible buildings in the neighborhood right now. Openigloo helps you narrow down faster with building-level research, including how rated buildings score (3.5/5 from 86 rated buildings), plus signals pulled from public records and renter-focused context. Use it alongside tenant Q&A to confirm what’s actually covered, who pays for utilities, and how the building handles maintenance and interruptions.
Buildings with heat and hot water included near the SIM10 bus in Gramercy Park
Showing 1–18 of 19 buildings with heat and hot water included near the SIM10 bus in Gramercy Park.

295 Park Avenue South
Gramercy Park

220 East 22 Street
Gramercy Park

245 East 19 Street
Gramercy Park
244 East 21 Street
Gramercy Park
320 East 23 Street
Gramercy Park
/-73.98152,40.733954,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
340 East 18 Street
Gramercy Park

210 East 22 Street
Gramercy Park

304 East 20 Street
Gramercy Park

239 Park Avenue South
Gramercy Park
/-73.983184,40.735195,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
317 2 Avenue
Gramercy Park
/-73.9824,40.737086,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
233 East 21 Street
Gramercy Park
/-73.983314,40.735072,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
243 East 18 Street
Gramercy Park
/-73.984297,40.738216,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
152 East 22 Street
Gramercy Park
/-73.984761,40.738435,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
134 East 22 Street
Gramercy Park
/-73.981672,40.73481,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
328 East 19 Street
Gramercy Park
/-73.981542,40.73476,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
332 East 19 Street
Gramercy Park
/-73.984164,40.736944,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
201 East 20 Street
Gramercy Park
/-73.982556,40.737104,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
229 East 21 Street
Gramercy Park
What to check before for buildings with heat and hot water included near the SIM10 bus in Gramercy Park
- Confirm the scope of “included” for heat and hot water in writing: coverage type, any seasonal caps, and whether there are exceptions for specific units or plans.
- Because these utilities are included, still ask what’s separate (often cooking gas/electric, Internet, and any A/C-related costs). Get the full monthly cost breakdown before signing.
- Use Openigloo to compare rated buildings side-by-side, then read recent questions and answers on maintenance and how outages are handled.
- For SIM10-bus proximity, check your exact walking time at the times you’d commute and whether the building entrance is on a quieter block than the stop area.
- If you’re sensitive to noise or building logistics, ask early about heat/hot-water response times, access for repairs, and any building procedures during peak demand.
- When touring, verify your unit’s expected utility setup (radiator type or boiler delivery, hot water pressure, and any roommate or multiple-unit arrangements).