Buildings with heat and hot water included near the M9 bus in Manhattan
This Openigloo page covers Manhattan buildings with heat and hot water included, plus the M9 bus route. You can browse 227+ buildings that match this multi-filter scope. Openigloo helps you narrow down faster using building-level details, ratings from rated buildings, and renter-focused context from reviews. You can also check open-data signals and tenant questions to spot common cost or maintenance issues, then confirm anything that depends on the unit or lease directly with the building.
Buildings with heat and hot water included near the M9 bus in Manhattan
Showing 19–36 of 227 buildings with heat and hot water included near the M9 bus in Manhattan.

40 Harrison Street
Tribeca
196 Stanton St
Lower East Side
611 East 11 Street
East Village
250 1 Avenue
Stuyvesant Town/PCV

80 Delancey Street
Lower East Side

117 East 7 Street
East Village
330 1 Avenue
Stuyvesant Town/PCV
525 East 13 Street
East Village
725 East 9 Street
East Village

107 St Marks Place
East Village
635 East 14 Street
Stuyvesant Town/PCV

194 East 2 Street
East Village
106 Fulton Street
Fulton/Seaport

195 Stanton Street
Lower East Side

521 East 14 Street
Stuyvesant Town/PCV
229 E 29 St
Kips Bay
49 Ludlow Street
Lower East Side
75 Orchard Street
Lower East Side
What to check before choosing a building with heat and hot water included near the M9 bus in Manhattan
- Confirm what “included” covers: ask whether both heat and hot water are included year-round or subject to building schedules or boiler settings.
- Before signing, verify the unit’s full monthly cost beyond rent: check for utilities, building fees, and any required deposits or services that still apply.
- Use the M9 bus proximity as a starting point, then validate walking time and stop access for your usual destinations at the times you commute.
- Look for restrictions that can affect move-in logistics (for example, laundry setups, package handling, and any building rules that impact your daily routine).
- If heat/hot-water included is a priority, ask how issues are handled during cold-water or high-demand periods and request the building’s response timeline.