Buildings with heat and hot water included near the M9 bus in Manhattan
This Openigloo page covers Manhattan buildings with heat and hot water included, plus the M9 bus route. You can browse 227+ buildings that match this multi-filter scope. Openigloo helps you narrow down faster using building-level details, ratings from rated buildings, and renter-focused context from reviews. You can also check open-data signals and tenant questions to spot common cost or maintenance issues, then confirm anything that depends on the unit or lease directly with the building.
Buildings with heat and hot water included near the M9 bus in Manhattan
Showing 37–54 of 227 buildings with heat and hot water included near the M9 bus in Manhattan.
312 East 30 Street
Kips Bay
230 East 27 Street
Kips Bay
17 Stuyvesant Oval
Stuyvesant Town/PCV

535 East 14 Street
Stuyvesant Town/PCV
71 Clinton Street
Lower East Side

310 East 2 Street
East Village
340 East 29 Street
Kips Bay

154 East 29 Street
Kips Bay
331 East Houston Street
Lower East Side
624 E 20 St
Stuyvesant Town/PCV

319 Avenue C
Stuyvesant Town/PCV
281 Avenue C
Stuyvesant Town/PCV

520 2 Avenue
Kips Bay
309 Avenue C
Stuyvesant Town/PCV

400 Chambers Street
Battery Park City
103 Avenue A
East Village
46 Avenue B
East Village
157 Suffolk Street
Lower East Side
What to check before choosing a building with heat and hot water included near the M9 bus in Manhattan
- Confirm what “included” covers: ask whether both heat and hot water are included year-round or subject to building schedules or boiler settings.
- Before signing, verify the unit’s full monthly cost beyond rent: check for utilities, building fees, and any required deposits or services that still apply.
- Use the M9 bus proximity as a starting point, then validate walking time and stop access for your usual destinations at the times you commute.
- Look for restrictions that can affect move-in logistics (for example, laundry setups, package handling, and any building rules that impact your daily routine).
- If heat/hot-water included is a priority, ask how issues are handled during cold-water or high-demand periods and request the building’s response timeline.