Buildings highly rated for pest control near the BM1 bus in NYC
This page tracks buildings highly rated for pest control near the BM1 bus in NYC. It uses Openigloo’s “best-pest-control” signal and the BM1-bus filter, covering 213+ buildings currently shown with this match. Openigloo helps you narrow faster using building-level ratings, tenant feedback, and open-data signals surfaced in the building pages. You can also check tenant Q&A and ask follow-up questions about current pest-control practices before you sign a lease.
Buildings highly rated for pest control near the BM1 bus in NYC
Showing 19–36 of 213 buildings highly rated for pest control near the BM1 bus in NYC.

395 South End Avenue
Battery Park City

15 Cliff Street
Fulton/Seaport

295 Park Avenue South
Gramercy Park
2138 Caton Avenue
Flatbush

429 East 52 Street
Turtle Bay
325 East 21 Street
Gramercy Park

420 East 54 Street
Sutton Place
220 East 24 Street
Kips Bay
320 East 23 Street
Gramercy Park
45 Hinckley Place
Prospect Park South

10 East 29 Street
NoMad
40 Gold Street
Fulton/Seaport
25 East 19 Street
Prospect Park South
/-73.969653,40.645013,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
60 Turner Place
Prospect Park South

1277 East 14 Street
Midwood

33 Caton Place
Windsor Terrace

88 Greenwich Street
Financial District

304 East 20 Street
Gramercy Park
What to check before choosing a building highly rated for pest control near the BM1 bus in NYC
- Confirm what “pest control” means for the building: whether treatment is scheduled, how infestations are handled, and what residents should report.
- Before applying, ask about timelines for response and whether access to units is required for treatments (and how notice is given).
- If you’ve seen pests before, ask how the building identifies sources (neighboring units, common areas, deliveries) and what prevention steps are in place.
- Check lease terms and move-in conditions: request details on pre-move pest prevention, documentation, and any guarantee or re-treatment policy.
- Verify operational details that affect outcomes, like super/management contact and whether the building tracks reports by unit or floor.