Buildings with heat and hot water included near the M5 bus in Manhattan
Browse Manhattan buildings with heat and hot water included, filtered to buildings near the M5 bus route. Right now, Openigloo shows 284+ eligible buildings matching this multi-filter pair. Use Openigloo to compare buildings using renter-first signals: building pages that consolidate open-data details, Openigloo review context, and tenant Q&A so you can confirm what “included” means for your specific unit (and any billing or exceptions) before you apply.
Buildings with heat and hot water included near the M5 bus in Manhattan
Showing 19–36 of 284 buildings with heat and hot water included near the M5 bus in Manhattan.

323 West 96 Street
Upper West Side

125 W 31 St
Midtown South

260 West 52 Street
Midtown

784 Columbus Avenue
Upper West Side
/-73.949223,40.830631,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
736 Riverside Drive
Hamilton Heights
230 West 55 Street
Midtown

304 West 92 Street
Upper West Side

66 West 38 Street
Midtown South

21 West End Avenue
All Upper West Side
150 West 47 Street
Midtown
240 W 64 St
All Upper West Side
/-73.966895,40.802431,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
246 West 108 Street
All Upper West Side
515 West 52 Street
Hell's Kitchen
570 West 182 Street
Fort George
240 West 73 Street
Upper West Side
401 West 56 Street
Hell's Kitchen

315 West 57 Street
Hell's Kitchen

220 West 98 Street
Upper West Side
What to check before choosing a building with heat and hot water included near the M5 bus in Manhattan
- Confirm in writing what’s covered under “heat + hot water included” (thermostat control, hours, and whether any portions are billed separately).
- Check the unit’s exposure and heating system type in the building notes; “included” doesn’t always mean identical comfort across apartments.
- Review lease terms for utilities, rent adjustments, and any addenda that change responsibilities during the lease term.
- If you’re sensitive to noise or foot traffic, look at street-facing vs. interior options near the M5 corridor before applying.
- Use the building page to cross-check any recorded building rules (laundry, package handling, thermostat restrictions) that can affect daily costs and logistics.