Pre-war buildings near the 1 train in NYC
Browse pre-war buildings near the 1 train in NYC, with 10,805+ buildings matching your filters. This page narrows to buildings built before 1947 and located along the 1 train corridor so you can compare commute-ready options. Openigloo helps you evaluate buildings faster with renter-first context: building pages with what’s available now, aggregated scores from rated buildings, and open-data signals paired with tenant Q&A so you can verify details directly with the building before you sign a lease.
Pre-war buildings near the 1 train in NYC
Showing 6,481–6,498 of 10,805 pre-war buildings near the 1 train in NYC.
/-73.950773,40.827632,14/640x640@2x?access_token=pk.eyJ1Ijoib3BlbmlnbG9vIiwiYSI6ImNsYjNmMjVwdzBjeHgzd21wYmJmZDB0eGYifQ.XZvZCOh51yXuDBE-I3Bg0A)
613 West 146 Street
Hamilton Heights

3 Hanover Street
Financial District

50 West 34 Street
Midtown South

20 Exchange Place
Financial District

1 West St
Financial District

160 Bleecker Street
Greenwich Village
110 Washington Street
Financial District

410 St Nicholas Avenue
Central Harlem

71 Broadway
Financial District

37 Wall Street
Financial District

67 Wall Street
Financial District
360 West 34 Street
Hudson Yards

244 West 64 Street
All Upper West Side

205 W 103 St
All Upper West Side

509 Cathedral Parkway
Morningside Heights

208 West 23 Street
Chelsea

150 West 51 Street
Midtown
90 West Street
Financial District
What to check before for pre-war buildings near the 1 train in NYC
- Confirm the exact walking time to your preferred 1 line stop, since “near” can vary by block.
- For pre-war buildings, ask about radiator/boiler type, insulation, and noise (old construction can mean different baseline comfort).
- Check for elevator availability, laundry access, and current unit layout/finishes; pre-war buildings can vary widely floor to floor.
- Use the building page signals and tenant Q&A, then contact management for the latest: monthly cost, move-in fees, and any policies that affect your lease terms.
- If you’re sharing documentation (income, employment, guarantors), ask what’s required up front to avoid delays. Requirements can differ by building even with similar corridors.